Docs
  • CNC machines
    Stronghold pro
    Stronghold One
    Rat RIg mill
    compact cnc electronics
    universal cnc electronics
  • 3D Printers
    V-Core 4.0
    V-Core 3.1
    V-Minion
    V-chonk
  • Structural
    Workbenches
    Enclosures
    Mill Enclosure
  • lab
    ModsUpcomingNon-CommercialLegacyCAD-Library
  • Community
V-Core 4.0
Shop Now
Project Details
Build
CADBomFIles
BUild GUide
MechanicalElectronicsFirmware
Upgrades
Hybrid upgradeIdex upgradeRAT PACKOrbiter v2 Smart Sensor
Commissioning
startConfiguration
Sanity checks
X steppers Y steppersZ steppersEndstopsHome sequenceBuild plate preparationHotend + fansPerformance mode
Calibration
Beacon set-upGantry twistRealtime analysisBelt TensionInput shapperVAOC (IDEX ONLY)Z endstop (IDEX ONLY)SKEW
Operation & Slicer
obtaining a slicerslicer configurationhow to sliceIDEX ModesSlice dual materialcopy + mirror mode

Mechanical

Assembly Guide

Step-by-step mechanical assembly guide for the V-Core 4.0 Standard Kit. Click on the button or keep scrolling.

V-Core 4.0 Assembly Guide - Dozuki

⚠️ Warning!

If you decide to follow the build guide trought this page, don't click on the "Continue with the next guide:" as it will redirect you to dozuki, just ignore the last step of each guide.

00. Preparations

Let's get started, this chapter is just a warmup.

01. Frame Assembly

Carefully assemble the frame as squareness is critical for smooth operation, take your time during the next steps.

02. Z-Axis assembly

The Z motors are responsible for the up and down movement of the bed and consequent layer stacking.

03. Linear rails

Linear rails on all axis ensure precise and stiff movement. Be sure to prepare your rails in order to obtain a smooth motion system.

04. Motion system - Core XY

Regular CoreXY motion system

05. Motion system - Hybrid

Full Speed with the hybrid.

06. x-axis assembly

A heavy-duty platform for the toolhead to speed through!

07. Bed assembly

The bed plate is precisely milled and surfaced to ensure it's as flat as possible.

08. Rat Rig V-Core 4 toolhead

High Performance, lightweight and powerfull cooling!

09. Toolhead - IDEX

High Performance, lightweight and powerfull cooling!

10. Gantry alignment

The X-Axis gantry needs to be perpendicular to the Y rails, the following steps will help you acomplish that.

11. Accessories

The accessories described in this guide will make your experience with the V-Core 4 much more enjoyable.

12. Electronics

The electronics are the components that make the mechanical assembly come to life! Some people say wiring a V-Core 4 is relaxing and stress relieving!

13. Enclosure

Enclose your machine to be able to print ABS, ASA, etc... noise reduction, improved safety and controled environment.

14. Hybrid+Idex Y Belts

Hybrid - Only install your Y belts during the commissioning guide
IDEX - Install them right away

15. IDEX Accessories

Install all the Idex necessary accessories.