Docs
  • CNC machines
    Stronghold pro
    Stronghold One
    Rat RIg mill
    compact cnc electronics
    universal cnc electronics
  • 3D Printers
    V-Core 4.0
    V-Core 3.1
    V-Minion
    V-chonk
  • Structural
    Workbenches
    Enclosures
    Mill Enclosure
  • lab
    ModsUpcomingNon-CommercialLegacyCAD-Library
  • Community
Rat Rig Mill
Shop Now
Project Details
BUild
BomFIles
BUild GUide
MechanicalElectronicsFirmwareEnclosure
Commissioning
Startwater pumpRodent PWMSanity checksE-stop circuitaxes directionsEndstop checkhome sequenceSquare and TramVFD configurationSpindle calibrationCAM - Fusion 360

Mechanical

Assembly Guide

00. Preparations

Let's prepare for the assembly

01. Y-Axis Assembly

Assembly of the Y-Axis.

02. Z Tower Assembly

In this chapter we will assemble the Z tower.

03. X-Axis Assembly

In this chapter we will assemble the X-Axis

04. Z-Axis Assembly

In this chapter we will assemble the Z-Axis

05. 2.2Kw spindle

In this chapter we will install the 2.2KW Spindle. Skip to the next chapter if you are using the Rat Rig Router.

06. Rat Rig Router

In this chapter we will install the Rat Rig router. Skip to the next chapter if you are using the 2.2KW Spindle.

07. Fixture plate

In this chapter we will install the fixture plate. The fixture plate is an accessory designed to improve workholding.